All Case Studies
Packaging & Print  ·  Program Lead

Operations Excellence Assessment:
Packaging Manufacturer

A structured four-pillar diagnostic that mapped 80% of production volume, confirmed the bottleneck location, and quantified every material waste stream — delivering a prioritized improvement roadmap tied to real financial impact.

$247KQ1 Waste Identified
$988K+Annual Opportunity
4Assessment Pillars
The Situation

Suspected Waste. No Way to Quantify It.

A growing North American packaging manufacturer suspected they were leaving significant money on the floor — but had no baseline data to confirm it, no agreed methodology to find it, and no prioritized roadmap to address it.

Management had intuition built from years on the plant floor. What they needed was a structured, data-anchored process to convert that intuition into verified numbers and a ranked list of where to act first.

Nextep was engaged to run a full Operations Excellence Assessment — four pillars, real plant data, financial output at the end.

The Approach

Data-Anchored. No Assumptions.

The Nextep assessment methodology runs four simultaneous analytical pillars across the operation. Every finding is anchored to actual production records, machine logs, and verified throughput data — not observation alone.

We mapped 80% of production volume, confirmed the primary bottleneck location, and quantified waste streams from material loss, speed loss, downtime, and utilization gaps. Nothing estimated. Everything verified.

The Four Pillars

How the Assessment Works

01
Value Stream Mapping
End-to-end process map of all major production flows. Every step timed, every handoff documented, every wait quantified. Bottleneck location confirmed with data.
02
OEE Analysis
Availability, Performance, and Quality loss broken out by machine, shift, and product family. Shows exactly where the gap between actual and achievable sits.
03
Utilization Deep-Dive
Labor and equipment utilization mapped against production schedule. Identifies chronic underutilization, scheduling gaps, and capacity hidden in plain sight.
04
Speed & Waste Quantification
Every material and speed loss converted to dollars per shift, per week, per year. No abstract percentages — financial figures management can act on.
Verified Results

$988K+ Annual Opportunity.
Mapped and Verified.

The assessment confirmed $247K in Q1 waste losses — extrapolated to a $988K+ annual waste elimination opportunity across material loss, speed loss, and utilization gaps. Every number tied to a specific finding from the plant data. The output was a ranked improvement roadmap with financial impact attached to each initiative — so leadership could decide where to deploy resources first.

$247KQ1 waste losses identified
$988K+Annual opportunity mapped
80%Of production volume mapped
What Comes Next

Assessment Is the Starting Line.

The Operations Excellence Assessment delivers a prioritized roadmap — ranked by financial impact, sequenced by implementation complexity, and anchored to real plant data. It's not a slide deck about best practices. It's a ranked list of where your money is going and what it will take to stop it.

Organizations that complete the Assessment have two options: implement the roadmap on their own with their existing team, or engage Nextep to lead implementation. Either way, you leave knowing exactly where to go and why. No guesswork. No ambiguity.

Ready to Stop
Leaving Money
On the Floor?